Axiatech
We offer innovative and efficient foundation solutions using helical piles, a superior alternative that maximizes economic, technical, and environmental benefits.
Ecopetrol S.A. proposes the construction of circuits 1, 2, 3, 4, 5, 6, 7, 12, 13, and 17, as well as the connection lines to the control centers A, B, C, D, and E, which are part of the Rubiales Electrification Master Plan (PMER).
In the Biobío region, in the municipality of Negrete, 35 km from the city of Los Ángeles, the construction of a wind farm is planned, consisting of 25 wind turbines that will be connected via 33 kV underground feeders to the new Rihue 220/33 kV substation.
At the height of the municipality of Loncoche, in the IX Region of La Araucanía, Chile, the substation sections the Cautín – Ciruelos 220 kV line and the Temuco – Loncoche 66 kV line, with the aim of improving the electrical infrastructure in the La Araucanía region.